Economic

Two Hydroelectric Dams Constructed in Khost

Friday, March 26, 2021
Khost (BNA) The construction of two hydroelectric dams in Jaji Maidan district has been completed
Engineer Zainullah Nasimi, in charge of the project related to the BNA, said that each of these dams has a capacity of one hundred and fifteen cubic meters of water storage.
In addition to irrigating hundreds of acres of land, it also prevents the speed of the Jaji Maidan Sea, which destroyed fields during flooding.
He said ten more dams are to be built along the sea.
T. Yarzada

Show More

Related Articles

Back to top button